Matala GeoNet installation for mountain slop erosion control in Taiwan
Erosion control
Matala EnviDrain and GeoNet used in Taiwan high way mountain slope for Erosion Control.
![]() |
![]() |
![]() |
![]() |
before construction for erosion control | prepare the slope soil surface | 1st layer EnviDrain GeoNet construction | 2nd layer installation on warp-around the GeoNet |
![]() |
![]() |
![]() |
![]() |
EnviDrain Pipe covered with nonwoven for drainage | EnviDrain panel with nonwoven installation | Reinforced GeoNet installation | plantation |
![]() |
![]() |
![]() |
![]() |
completion of the construction (Dec.2002) | completion of the construction (Dec.2002) | one month after construction (Jan.2003) | 6 months after construction (May 2003) |
![]() |
![]() |
||
6 months after construction (May 2003) |
6 months after construction (May 2003) |